LAS
LAS maps orders to dispatches and determineswhich primary contractor receives the transport data
LAS splits even consolidated (mixed) loads by primary contractor in three stages: LAS pre-determination, LAS model determination and LAS second-pass determination. Ambiguous dispatches are also confirmed automatically in the second pass, so nothing is left for manual review.
- LAS pre-determination
- LAS model determination
- LAS second-pass determination
LAS measured · 180 dispatches
The LAS engine resolved 180 dispatches in 5.0 seconds,35× and 95× faster than two frontier language models
LTS measurement 2026-09-29 · three sets of primary-contractor order spreadsheets, carrier dispatches, DTG trip records · the same full input processed at once · median of 3 runs per engine · public API rates · exchange rate KRW 1,359.4 · all three engines correct in all 3 runs · video at 60× speed
01 Determination
LAS cross-checks order and dispatch tables and determineswhich primary contractor receives each dispatch's transport data
Time and cost to process the same full input at once
Even as the number of dispatches grows,LAS completes determination within seconds
| Dispatches | LAS engine | Claude Fable 5.1 | GPT-6 Astra |
|---|---|---|---|
| 9 | 2.16 s · KRW 0.26 | 26.5 s · KRW 224.8 | 48.4 s · KRW 130.9 |
| 45 | 4.41 s · KRW 0.49 | 63.2 s · KRW 569.2 | 158.9 s · KRW 443.6 |
| 180 | 5.03 s · KRW 0.65 | 176.1 s · KRW 1,760.3 | 477.8 s · KRW 1,419.6 |
LTS measurement 2026-09-29 · median of 3 runs per engine · public API rates (per 1 million input tokens) · exchange rate KRW 1,359.4
Determination accuracy
The LAS notation dictionary resolves 60.0% of target dispatches,while the full LAS engine resolves 97.2% of them
Talk to us
LTS presents a LAS determination setup that fitsthe primary contractor's order and dispatch formats
In a consultation, an LTS representative explains the scope and terms of adoption for your fleet size and partner-carrier structure.